Project · Molenbeek
Apartment in Molenbeek
How we renewed a two-bedroom apartment from floor to ceiling.

This two-bedroom apartment still had its old tiles, worn parquet and original bathroom. We took up every floor, renewed the electrics and wiring to bring them up to standard, and replaced the existing windows with triple-glazed PVC frames. The bathtub made way for a modern shower room, with a wall-hung toilet. Every door was replaced, the walls were given a thin skim coat of plaster before the whole apartment was painted, and Quick-Step vinyl flooring was laid on an insulating underlay.
- Property
- Two-bedroom apartment
- Location
- Molenbeek
- Year
- 2026
- Work carried out
- Interior renovation, Plumbing & bathrooms, Electrical work & compliance, Flooring, Windows & frames, Painting
Project phases
Strip-out
Every floor in the apartment taken up.
Electrics and windows
Wiring renewed and electrics brought up to standard, existing windows replaced with triple-glazed PVC frames.
Shower room and toilet
A new modern shower room and a wall-hung toilet.
Finishing
A thin skim coat and paint throughout, new doors, and Quick-Step vinyl flooring on an insulating underlay.
Before and after
The same views, before work began and at handover.
Living room, balcony side

Before 
After Shower room

Before 
After Bedroom

Before 
After Small bedroom

Before 
After Kitchen

Before 
After Entrance hall

Before 
After

