Skip to content

Project · Molenbeek

Apartment in Molenbeek

How we renewed a two-bedroom apartment from floor to ceiling.

Apartment in Molenbeek – 1

This two-bedroom apartment still had its old tiles, worn parquet and original bathroom. We took up every floor, renewed the electrics and wiring to bring them up to standard, and replaced the existing windows with triple-glazed PVC frames. The bathtub made way for a modern shower room, with a wall-hung toilet. Every door was replaced, the walls were given a thin skim coat of plaster before the whole apartment was painted, and Quick-Step vinyl flooring was laid on an insulating underlay.

Property
Two-bedroom apartment
Location
Molenbeek
Year
2026
Work carried out
Interior renovation, Plumbing & bathrooms, Electrical work & compliance, Flooring, Windows & frames, Painting

Project phases

  1. Strip-out

    Every floor in the apartment taken up.

  2. Electrics and windows

    Wiring renewed and electrics brought up to standard, existing windows replaced with triple-glazed PVC frames.

  3. Shower room and toilet

    A new modern shower room and a wall-hung toilet.

  4. Finishing

    A thin skim coat and paint throughout, new doors, and Quick-Step vinyl flooring on an insulating underlay.

Before and after

The same views, before work began and at handover.

  • Living room, balcony side

    Living room, balcony side before the works
    Before
    Living room, balcony side after the works
    After
  • Shower room

    Shower room before the works
    Before
    Shower room after the works
    After
  • Bedroom

    Bedroom before the works
    Before
    Bedroom after the works
    After
  • Small bedroom

    Small bedroom before the works
    Before
    Small bedroom after the works
    After
  • Kitchen

    Kitchen before the works
    Before
    Kitchen after the works
    After
  • Entrance hall

    Entrance hall before the works
    Before
    Entrance hall after the works
    After